- Başla >
- Türkiye >
- Uygulama raporları >
- 2010
2010
Lindner-Werke, Dettelbach, Germany
Industrial manufacture of gypsum fibreboard panels
Daha fazla bilgi alSurface suction removal, Wallenhorst, Germany
Suction withdrawal of foam and floating dirt particles from the surface of the basin
Daha fazla bilgi alDealer support, Lingen, Germany
Holding of an open day at a key dealership
Daha fazla bilgi alPump Testing Days, Fürth, Germany
Pump testing days in-house at Gebr. Mayer, electrical and mechanical testing
Daha fazla bilgi alBibra Tunnel, Germany
The Bibra Tunnel is part of the German Unit No. 8 construction project, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Berlin
Daha fazla bilgi alOn-site training, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Daha fazla bilgi alPumped Storage Power Station, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Daha fazla bilgi alMUCEM, Marseille, France
Dumez Mediterranée Company (VINCI Group) New construction of the MUCEM (Museum of European and Mediterranean Civilizations) in Marseille, on an area of 26,000 m3
Daha fazla bilgi alToulon Tunnel, France
Tunnelling beneath the city centre of Toulon, length 3310 m, diameter 8.25m
Daha fazla bilgi alClarification plant, Põlgaste, Estonia
Renovation of a clarification plant
Daha fazla bilgi alFlooding, Tartu, Estonia
Pumping water out of a flood zone
Daha fazla bilgi alWaste Water Clarification at Campsite, Croatia
Establishment of a clarification treatment plant for a campsite on Krk Island
Daha fazla bilgi al