Lindner-Werke, Dettelbach, Germany
Industrial manufacture of gypsum fibreboard panels
Citiţi mai multeSurface suction removal, Wallenhorst, Germany
Suction withdrawal of foam and floating dirt particles from the surface of the basin
Citiţi mai multeDealer support, Lingen, Germany
Holding of an open day at a key dealership
Citiţi mai multePump Testing Days, Fürth, Germany
Pump testing days in-house at Gebr. Mayer, electrical and mechanical testing
Citiţi mai multeBibra Tunnel, Germany
The Bibra Tunnel is part of the German Unit No. 8 construction project, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Berlin
Citiţi mai multeOn-site training, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Citiţi mai multePumped Storage Power Station, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Citiţi mai multeMUCEM, Marseille, France
Dumez Mediterranée Company (VINCI Group) New construction of the MUCEM (Museum of European and Mediterranean Civilizations) in Marseille, on an area of 26,000 m3
Citiţi mai multeToulon Tunnel, France
Tunnelling beneath the city centre of Toulon, length 3310 m, diameter 8.25m
Citiţi mai multeClarification plant, Põlgaste, Estonia
Renovation of a clarification plant
Citiţi mai multeFlooding, Tartu, Estonia
Pumping water out of a flood zone
Citiţi mai multeWaste Water Clarification at Campsite, Croatia
Establishment of a clarification treatment plant for a campsite on Krk Island