- Start >
- Portugal >
- Application reports >
- 2010
2010
Lindner-Werke, Dettelbach, Germany
Industrial manufacture of gypsum fibreboard panels
Read moreSurface suction removal, Wallenhorst, Germany
Suction withdrawal of foam and floating dirt particles from the surface of the basin
Read moreDealer support, Lingen, Germany
Holding of an open day at a key dealership
Read morePump Testing Days, Fürth, Germany
Pump testing days in-house at Gebr. Mayer, electrical and mechanical testing
Read moreBibra Tunnel, Germany
The Bibra Tunnel is part of the German Unit No. 8 construction project, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Berlin
Read moreOn-site training, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Read morePumped Storage Power Station, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Read moreMUCEM, Marseille, France
Dumez Mediterranée Company (VINCI Group) New construction of the MUCEM (Museum of European and Mediterranean Civilizations) in Marseille, on an area of 26,000 m3
Read moreToulon Tunnel, France
Tunnelling beneath the city centre of Toulon, length 3310 m, diameter 8.25m
Read moreClarification plant, Põlgaste, Estonia
Renovation of a clarification plant
Read moreFlooding, Tartu, Estonia
Pumping water out of a flood zone
Read moreWaste Water Clarification at Campsite, Croatia
Establishment of a clarification treatment plant for a campsite on Krk Island
Read more