Sei qui:
- Inizio >
- Italia >
- Relazioni sull'uso >
- 2010
2010
Lindner-Werke, Dettelbach, Germany
Industrial manufacture of gypsum fibreboard panels
Maggiori informazioni
Surface suction removal, Wallenhorst, Germany
Suction withdrawal of foam and floating dirt particles from the surface of the basin
Maggiori informazioni
Pump Testing Days, Fürth, Germany
Pump testing days in-house at Gebr. Mayer, electrical and mechanical testing
Maggiori informazioni
Bibra Tunnel, Germany
The Bibra Tunnel is part of the German Unit No. 8 construction project, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Berlin
Maggiori informazioni
On-site training, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Maggiori informazioni
Pumped Storage Power Station, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Maggiori informazioni
MUCEM, Marseille, France
Dumez Mediterranée Company (VINCI Group) New construction of the MUCEM (Museum of European and Mediterranean Civilizations) in Marseille, on an area of 26,000 m3
Maggiori informazioni
Toulon Tunnel, France
Tunnelling beneath the city centre of Toulon, length 3310 m, diameter 8.25m
Maggiori informazioni
Waste Water Clarification at Campsite, Croatia
Establishment of a clarification treatment plant for a campsite on Krk Island
Maggiori informazioni
