Surface suction removal, Wallenhorst, Germany
Suction withdrawal of foam and floating dirt particles from the surface of the basin
Lees meer
Pump Testing Days, Fürth, Germany
Pump testing days in-house at Gebr. Mayer, electrical and mechanical testing
Lees meer
Bibra Tunnel, Germany
The Bibra Tunnel is part of the German Unit No. 8 construction project, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Berlin
Lees meer
On-site training, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Lees meer
Pumped Storage Power Station, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Lees meer
MUCEM, Marseille, France
Dumez Mediterranée Company (VINCI Group) New construction of the MUCEM (Museum of European and Mediterranean Civilizations) in Marseille, on an area of 26,000 m3
Lees meer
Toulon Tunnel, France
Tunnelling beneath the city centre of Toulon, length 3310 m, diameter 8.25m
Lees meer
Waste Water Clarification at Campsite, Croatia
Establishment of a clarification treatment plant for a campsite on Krk Island